Pasukan Projek Penyaluran Air Mentah Pahang - Selangor (PPAMPS) | KeTTHA
be 44.6 km in length, including the inlet connecting basin, inlet conduit and outlet conduit. The inlet connecting basin is located on the hill about 300 m from the Karak-Telemong road and the outlet conduit ends about 3.5 km north of the existing Sg. Langat treatment plant. The tunnel route passes through the main central mountain range which the treatment plant with pipelines maintaining gravity flow. Thus the outlet water level is set at EL. 61.2 m. Bedrock along the tunnel consists of metamorphosed rocks of the Karak Formation for the initial 3.5 km from the inlet. The remaining portion is in granites. Tunnel excavation will primarily be made by Tunnel Boring Machine (TBM) for 35 km
|
|
Tesaurus |
---|
| Tiada maklumat tesaurus untuk kata karak |
|
|